1.2 km, 36 months and zero lost-time incidents. How our team delivered the city's new cable-stayed bridge.͏‌ ͏‌ ͏‌ ͏‌ ͏‌ ͏‌ ͏‌ ͏‌ ͏‌ ͏‌ ͏‌ ͏‌ ͏‌ ͏‌ ͏‌ ͏‌ ͏‌ ͏‌ ͏‌ ͏‌ ͏‌ ͏‌ ͏‌ ͏‌ ͏‌ ͏‌ ͏‌ ͏‌ ͏‌ ͏‌ ͏‌ ͏‌ ͏‌ ͏‌ ͏‌ ͏‌ ͏‌ ͏‌ ͏‌ ͏‌ ͏‌ ͏‌ ͏‌ ͏‌ ͏‌ ͏‌ ͏‌ ͏‌ ͏‌ ͏‌ ͏‌ ͏‌ ͏‌ ͏‌ ͏‌ ͏‌ ͏‌ ͏‌ ͏‌ ͏‌ 
Northwind GoodsProjectsServicesCareers

Project complete · 2026

The
Riverlink
Crossing
is open.

Four years from first drawing to first traffic, and the river open to shipping every single day.

Read the case study
1.2 km
main span and approaches
36 mo
on site, on programme
 
1,400
people on the job
0
lost-time incidents

Four years, one river kept open

On Monday the first cars crossed the Riverlink. Behind them: 1,400 people, 38,000 tonnes of steel and concrete, and a construction sequence redesigned twice so that barges never waited a day.

The scheme · part schedule

What holds it up

Massive concrete piers of the crossing rising out of the river, seen from beneath the deck
PartQuantitySpecification
Main span480 mCable-stayed, twin plane
Pylon142 mC80 high-strength concrete
Deck38,000 tSteel-concrete composite
Piles962.4 m bored, 40 m deep
Four engineers in hard hats and hi-vis reviewing drawings on site

The people who built it

Our joint venture trained 120 apprentices on this project. Forty have already joined us full-time.

Careers